PharmaLectures.com

Courses › Pharma training by line of business › The regulatory file every European buyer will ask the packaging and machinery supplier for

The regulatory file every European buyer will ask the packaging and machinery supplier for

Stop European installations stalling over one missing line in your machinery file.

  • 8 audio modulesthree lengths each
  • 1 h 20 min to 6 h 40 minbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • Packaging and machinery supplierwho it is written for

Why this training matters

A buyer's quality team opens your Declaration of Conformity and finds a directive missing, or a technical file that cannot answer one Annex I requirement. The machine sits idle while they raise a deviation. Your handover slips past the date the project was built around.

What changes after this course

Your engineers and sales staff hand over a document set that answers the quality team's questions before the meeting. The machine reaches the Factory Acceptance Test with the file already in order. You hold a certificate for each learner and a training record per person.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

What this course gives your people

Your sales engineer stops promising to check with regulatory when a buyer asks which Annex I requirement of Machinery Directive 2006/42/EC covers a guard. The answer sits in the technical file and you know the page. The buyer's quality team gets a straight reply in the meeting, not an email chain days later.

A Declaration of Conformity leaves your desk right the first time. It names the applied directives and standards, the manufacturer's full address and the person authorised to compile the file, as Annex II requires. The technical file follows Annex VII, so every drawing, calculation and test report sits where a reviewer looks first.

Risk assessments follow EN ISO 12100, so each hazard has a protective measure beside it, including the ones that appear only during cleaning or maintenance. Your technical writers produce user manuals and installation instructions that meet the Directive. Material and cleanability records answer what EudraLex Volume 4, Chapter 3 leads the buyer's quality team to ask about product-contact parts.

At the Factory Acceptance Test, your field technician has the material certificate and the software validation records in the folder before the auditor asks. A challenge to a certificate gets a calm, documented answer. The handover becomes routine, with fewer reasons for sign-off to wait.

Who needs this training

  • Regulatory Affairs Specialist

    A buyer asks which essential requirement of the Machinery Directive covers a given hazard, and the answer lives in someone else's folder. After the course, you point to the exact document in the technical file.

  • Technical Documentation Manager

    Compiling the Annex VII file means chasing engineers for calculations and test reports. With a clear order for the file and a checklist for CE marking, the file closes before the machine ships.

  • European Sales Manager

    The buyer hesitates to sign because the Declaration of Conformity looks generic. You explain which directives apply and why, and the contract stays on schedule.

  • Quality Assurance Engineer

    Material certificates for product-contact parts go missing the day before the Factory Acceptance Test. You build the certificate package in advance and know what the auditor will challenge.

  • Technical Writer

    User manuals get written last, then rewritten after the buyer's comments. You write installation and maintenance instructions to Annex I, section 1.7.4, the first time.

Roles: Regulatory affairs, Quality assurance and Qualified Person

Businesses: Packaging and machinery supplier

Countries: India, China, Türkiye, Korea, Japan, Taiwan, Egypt, Gulf and MENA, Brazil and Latin America, Pakistan, Bangladesh and Vietnam, United States, Europe

Selling into: Europe and the UK

Courses are in English. Other languages on request.

After this course your people can

  1. Draft a Declaration of Conformity that lists the applied directives, standards and identification details Annex II requires.
  2. Decide whether a machine needs a Declaration of Conformity or a Declaration of Incorporation, and say why.
  3. Assemble a technical file with the contents Annex VII Part A lists, ready for an authority or buyer to review.
  4. Document each machine hazard and its protective measure in line with EN ISO 12100.
  5. Show a pharmaceutical buyer the material traceability and cleanability records for product-contact parts under EudraLex Volume 4.
  6. Write installation and maintenance instructions that a buyer's technicians can follow without calling you.
  7. Produce the software validation records a buyer asks to see at the Factory Acceptance Test.

What the company gets

  • Your Declaration of Conformity and technical file answer the buyer's quality team before a deviation is raised.
  • Sales and engineering give the same answer about what Machinery Directive 2006/42/EC requires, so fewer hours go to internal argument.
  • The technical file is ready for any authority that asks, for the ten years after the last unit that Annex VII sets.
  • Material certificates and software records are ready before the Factory Acceptance Test, so a missing page stops being the reason for a delay.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 8 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing1 h 20 min10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard3 h 20 min25 min a module, for regulatory, quality and business-development staff
Expanded6 h 40 min50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Regulatory affairsStandard3 h 20 min
Quality assurance and Qualified PersonStandard3 h 20 min

Course outline: 8 modules

8 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Map Machinery Directive 2006/42/EC to your packaging equipment

    • When a packaging line counts as machinery under 2006/42/EC and when a supplied part does not.
    • How to tie each Annex I safety requirement to a design choice you can point to.
    • Why citing a harmonised standard earns you presumption of conformity in the buyer's review.
  2. 2Collect the documents your CE marking needs before the buyer asks

    • The documents a buyer's quality team asks for first, ready in one folder before the request arrives.
    • How to check whether your machine appears in Annex IV and what that changes for your CE marking.
    • What to do when a sub-supplier's component certificate arrives incomplete just before shipping.
  3. 3Draft a Declaration of Conformity the buyer's quality team accepts

    • How to list every applied directive and standard so the buyer's quality team signs without a query.
    • The identification details Annex II requires, from the manufacturer's address to the file compiler.
    • When to issue a Declaration of Incorporation instead, and when that choice stalls the buyer.
  4. 4Document your EN ISO 12100 risk assessment so an auditor can follow it

    • How to show an inspector that each hazard on your machine has a protective measure beside it.
    • The three-step order of risk reduction in EN ISO 12100, set out so an auditor can follow it.
    • What to do when a maintenance or cleaning task turns up a hazard your first assessment missed.
  5. 5Build an Annex VII technical file that holds up at the buyer's site

    • How to order drawings, calculations and test reports so a reviewer finds each one without calling you.
    • The Annex VII items that go missing under deadline, and the check that catches them before release.
    • Why the file must stay available for ten years after the last unit, and who keeps it.
  6. 6Prove contact parts meet Good Manufacturing Practice rules

    • How EudraLex Volume 4, Chapter 3 shapes what the buyer expects from your product-contact surfaces.
    • The material records that let a pharmaceutical buyer trace each contact part to its certificate.
    • Why a machine that meets the Machinery Directive can still fail a Good Manufacturing Practice audit.
  7. 7Write user manuals that keep operators safe and machines undamaged

    • How to write installation steps so the buyer's technicians set up the machine right the first time.
    • When the Directive requires instructions in the buyer's language, and how to mark the original.
    • Why a vague maintenance step lets the buyer's team skip it, and how to write one they follow.
  8. 8Answer buyer questions and pass the Factory Acceptance Test

    • How to explain your CE marking route in a short, calm answer when a buyer pushes back.
    • The software records a buyer needs for EudraLex Volume 4 Annex 11, ready before the test starts.
    • What to say when an auditor challenges a material certificate and you must answer on the spot.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about this course

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

8 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 1 h 20 min in the briefing length and 6 h 40 min in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for Packaging and machinery supplier. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

What does it cost per learner?

The list price is 9 euros per module, per learner, per year, so this course is 72 euros for one person for twelve months. The price per learner falls as more people take the same course: 10 learners pay 10 percent less and the discount keeps growing to 50 percent at 1000 learners. Type a number on the price panel and the yearly total appears.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team