PharmaLectures.com

Courses › Country and business playbooks › Selling into Europe as a packaging and machinery supplier from Taiwan

Selling into Europe as a packaging and machinery supplier from Taiwan

Your team answers European compliance questions on the spot and keeps deals moving.

  • 12 audio modulesthree lengths each
  • 2 h to 10 hbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • Taiwan, Packaging and machinery supplierwho it is written for

Why this training matters

A European buyer's quality team opens your technical file and finds no pharmaceutical safety data. Their validation schedule stops while your engineers in Taiwan rewrite pages across time zones. The next project phase goes to another supplier.

What changes after this course

Your sales engineers answer Good Manufacturing Practice questions before the buyer asks, and your proposals match European rules in the first draft. You hold a certificate for each learner who finishes and a training record for every person on the team.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

What this course gives your people

A buyer asks how your machine supports Annex 1 for sterile manufacturing, and your sales engineer answers in the room instead of promising a reply from Taiwan. Your technical file follows Annex VII of Machinery Directive 2006/42/EC, so a safety inspector finds each document where it should be. CE marking stops holding up the order, and the buyer's quality team sees you know EudraLex Volume 4.

The User Requirements Specification arrives and your project manager reads it for what is hidden, not just what is stated. The proposal answers each line, and the Factory Acceptance Test protocol is one the client's quality team signs without edits. At the Site Acceptance Test your technicians know what the handover record must show, so final payment is not left waiting.

Installation Qualification and Operational Qualification data travel with the machine, in the form validation teams working to Annex 15 of EudraLex Volume 4 expect. Failure Mode and Effects Analysis is done during design, so risk questions are answered before a client auditor visits your Taiwan plant. Manuals and factory records hold up when the inspector asks to see them.

Contract talks move faster because your Service Level Agreement says what you can really deliver on spare parts, repair response and warranty. Your export managers write and speak in the plain engineering language European buyers use, and a first machine sale becomes the start of a supply relationship.

Who needs this training

  • European Market Sales Manager

    A prospect questions a point of EudraLex Volume 4 mid-pitch, and you answer on the spot instead of pausing to phone engineering in Taiwan.

  • Pharmaceutical Equipment Project Engineer

    A client's User Requirements Specification lands on your desk, and you turn it into a Factory Acceptance Test protocol the client signs, not one rejected at final inspection.

  • Quality Assurance Lead

    Before an audit visit, you assemble Installation Qualification and Operational Qualification files that already hold the equipment data European auditors ask for, instead of rewriting them at night.

  • After-Sales Service Coordinator

    You write the Service Level Agreement with spare parts promises your supply chain can keep through European customs, so maintenance teams stop calling you in anger.

Roles: Owner, CEO and board, Business development and export sales, Regulatory affairs, Quality assurance and Qualified Person

Businesses: Packaging and machinery supplier

Countries: Taiwan

Selling into: Europe and the UK

Courses are in English. Other languages on request.

After this course your people can

  1. Answer a buyer's question on how your machine supports Annex 1 for sterile manufacturing, using the design details that prove it.
  2. Assemble a technical file to Annex VII of Machinery Directive 2006/42/EC that a safety inspector can check document by document.
  3. Find the hidden demands in a User Requirements Specification and mark which ones fall outside the project scope.
  4. Write Factory Acceptance Test and Site Acceptance Test protocols that the client's quality team signs without asking for extra tests.
  5. Supply Installation Qualification and Operational Qualification data with each delivery, in the order a validation team reviews it.
  6. Draft Service Level Agreement clauses for spare parts and repair response times that your service team can really meet.
  7. Run a Failure Mode and Effects Analysis and file it with the risk assessment behind your machine design.

What the company gets

  • Your firm stops losing European bids because the CE marking file is incomplete or hard to read.
  • Sales cycles shorten because your engineers answer Good Manufacturing Practice questions in the meeting, not in a follow-up email.
  • Factory Acceptance Tests finish on schedule, so machines ship and invoices go out when the contract says.
  • Your Taiwan plant meets a European client audit with records already in order and a straight answer to each safety question.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 12 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing2 h10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard5 h25 min a module, for regulatory, quality and business-development staff
Expanded10 h50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Owner, CEO and boardBriefing2 h
Business development and export salesBriefing2 h
Regulatory affairsStandard5 h
Quality assurance and Qualified PersonStandard5 h

Course outline: 12 modules

12 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Match your machine to European pharmaceutical rules and agency expectations

    • Why a buyer's quality team reads EudraLex Volume 4 before it reads your brochure.
    • How to tell a buyer which rules bind you as a supplier and which bind only the drug manufacturer.
    • The one-page map of agency rules that lets your sales manager answer in the meeting, not next week.
  2. 2Apply Good Manufacturing Practice principles to your machinery design

    • What to say when a buyer asks how your machine supports Annex 1 for sterile manufacturing.
    • The surface, joint and cleaning details that make a quality team reject a machine on sight.
    • How to show Chapter 3 of EudraLex Volume 4 in your design drawings before anyone asks.
  3. 3Secure CE marking under Machinery Directive 2006/42/EC

    • Why CE marking on the nameplate leaves a pharmaceutical buyer's quality questions unanswered.
    • The documents a market surveillance inspector expects beside your declaration of conformity.
    • How to build the technical file to Annex VII so nothing is missing when the request arrives.
  4. 4Turn a User Requirements Specification into a proposal that wins

    • How to spot the costly demand buried deep in a User Requirements Specification.
    • The proposal layout that lets a client's project engineer tick off each requirement in one pass.
    • What to do when a requirement runs past the project scope and the price you quoted.
  5. 5Pass Factory Acceptance Tests in Taiwan without rework or delay

    • How to write a Factory Acceptance Test protocol the client's quality team signs without edits.
    • The test order that lets a European visitor approve the machine in your Taiwan hall, not at their dock.
    • Why one missing record in the test paperwork holds the shipment and your invoice with it.
  6. 6Clear Site Acceptance Tests and trigger final equipment handover

    • What your technicians check first on arrival so handover is signed without a second visit.
    • What to do when the client's utilities or floor are not as drawn, and the test must still pass.
    • The handover record that shows the machine performs as the contract says, line by line.
  7. 7Hand over Installation and Operational Qualification data first time

    • How to hand over Installation Qualification data that lets the client start without chasing you.
    • The Operational Qualification measurements a validation team wants in the pack before testing.
    • Why Performance Qualification succeeds or fails on parameters you fix at the design stage.
  8. 8Deliver technical files and user manuals that pass audits

    • How to write a user manual a maintenance technician in Europe can follow without phoning Taiwan.
    • The validation documents an auditor expects in the delivery pack, in the order they look for them.
    • How to keep your proprietary design details private while the file still meets Annex VII.
  9. 9Use Failure Mode and Effects Analysis to prevent issues before the sale

    • How to run Failure Mode and Effects Analysis so it feeds the risk assessment behind your design.
    • The worksheet layout a European quality assurance manager reads quickly and trusts.
    • Why naming a risk during the quote prevents the warranty argument after installation.
  10. 10Pass client inspections at your Taiwan manufacturing facility

    • What a European auditor checks on your shop floor before the purchase order is released.
    • How to arrange production records so the auditor's questions end at the first folder.
    • The first words to say when an auditor flags a safety concern on your packaging machine.
  11. 11Draft Service Level Agreements that protect your margins

    • How to word spare parts availability so you never promise what customs and suppliers can't deliver.
    • The warranty clauses that keep a European client content and protect your service team's time.
    • What to offer when a buyer demands repair response times your engineers can't reach.
  12. 12Align your technical writing with European engineering standards

    • How to present a specification so a European engineer sees your approach as sound, not foreign.
    • The small habits in emails and drawings that earn a pharmaceutical buyer's trust over years.
    • What to say when a negotiation stalls over a small difference in reading a regulation.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about this course

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

12 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 2 h in the briefing length and 10 h in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for Taiwan, Packaging and machinery supplier. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

What does it cost per learner?

The list price is 9 euros per module, per learner, per year, so this course is 108 euros for one person for twelve months. The price per learner falls as more people take the same course: 10 learners pay 10 percent less and the discount keeps growing to 50 percent at 1000 learners. Type a number on the price panel and the yearly total appears.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team