PharmaLectures.com

Courses › GMP, GDP, quality and compliance › ICH Q10 for a company that is not Pfizer: a Pharmaceutical Quality System built from scratch

ICH Q10 for a company that is not Pfizer: a Pharmaceutical Quality System built from scratch

Build a Pharmaceutical Quality System your team can defend on inspection day.

ICH Q10 describes a pharmaceutical quality system: the management framework that sits above individual GMP procedures and makes a company improve on purpose rather than by accident. Adopted in 2008, it names four elements, process performance and product quality monitoring, corrective and preventive action, change management, and management review, and two enablers, knowledge management and quality risk management. It covers the full product life cycle. In Europe its ideas were written into Chapter 1 of the EU GMP guide in 2013, which is why inspectors ask to see management review minutes, not just procedures.

  • 12 audio modulesthree lengths each
  • 2 h to 10 hbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • QA, managementwho it is written for

Why ICH Q10 pharmaceutical quality system training matters

An inspector asks for your Quality Manual and the procedure behind each section is missing. The Food and Drug Administration writes a Form 483 on how you handle deviations, and the product launch waits. Your team spends the next months writing corrective actions instead of making product.

What changes after this course

Your team builds a Pharmaceutical Quality System sized to your company, with a manual, procedures and records that answer the inspector's question directly. You hold a certificate for each learner and a training record for each person, ready for the personnel file.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

ICH Q10 pharmaceutical quality system training: what this course gives your people

Your Quality Manual maps to International Council for Harmonisation Q10 section by section, and the procedures behind it match what the Food and Drug Administration reads in 21 Code of Federal Regulations Part 211. The quality policy gets used in management review, where objectives sit next to the production plan. Nobody on your team guesses what an inspector expects.

A change request leaves the operator's hands with its impact assessment attached, so the decision does not wait on a desk. Deviations close with a root cause and a corrective and preventive action that holds. At year end the Annual Product Review shows a process trend before it turns into a failed batch.

Records follow the Attributable, Legible, Contemporaneous, Original and Accurate rules, and the document controller keeps superseded versions off the floor. Internal auditors arrive with a checklist built on European Union Good Manufacturing Practice Chapter 9 on self-inspection. Quality agreements follow Chapter 7 on outsourced activities and name who does what.

Quality risk management under Q9 decides what is validated first, and the line keeps moving while it does. Operators follow procedures because they know which patient depends on the step. When the inspector asks for a batch record, the right file is on the table before the question ends.

Who needs ICH Q10 pharmaceutical quality system training

  • Quality Assurance Manager

    You sit down to draft a procedure and need a template that meets Q10 and 21 Code of Federal Regulations Part 211 without adding another approval step to daily work.

  • Head of Operations

    A deviation stops the line on a Tuesday. You need your team to find the root cause and sign off a fix so production restarts with the quality unit's agreement.

  • Regulatory Affairs Specialist

    You prepare a submission for a new market and must describe change control and supplier qualification to the reviewing health authority in words that match what the site actually does.

  • New Quality System Implementer

    Management hands you the task of building a system from nothing. You need a step-by-step order of work that ends in a Quality Manual that survives your first external audit.

  • Managing Director of a small manufacturer

    Your largest customer asks how your quality system is set up before signing a supply contract, and you need a clear answer, not a promise to send documents later.

Roles: Owner, CEO and board, Quality assurance and Qualified Person

Businesses: every kind of pharma company

Countries: India, China, Türkiye, Korea, Japan, Taiwan, Egypt, Gulf and MENA, Brazil and Latin America, Pakistan, Bangladesh and Vietnam, United States, Europe

Selling into: any jurisdiction

Courses are in English. Other languages on request.

After this course your people can

  1. Draft a Quality Manual that points each International Council for Harmonisation Q10 expectation to the procedure that meets it.
  2. Write a standard operating procedure that an operator can follow on the line without asking a colleague.
  3. Close a deviation with a documented root cause and a corrective and preventive action you can show an inspector.
  4. Compile an Annual Product Review that shows whether a process is stable or drifting.
  5. Run an internal audit and write findings that management accepts and closes.
  6. Draft a quality agreement that sets out what your contract manufacturer must do and report.
  7. Rank processes for validation with a documented risk assessment.

What the company gets

  • Your site faces an inspection knowing that every procedure the Quality Manual refers to exists and is in force.
  • Management hands a clear Quality Manual to a prospective client or contract partner when asked, instead of promising to send one later.
  • Your quality department spends less time on repeat deviations, because each cause is fixed once and the fix is on record.
  • Supplier qualification catches a poor raw material before it reaches the line, so a batch is not held because of it.
  • Each learner leaves with a certificate and a training record, so the personnel file answers the auditor's training question.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 12 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing2 h10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard5 h25 min a module, for regulatory, quality and business-development staff
Expanded10 h50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Owner, CEO and boardBriefing2 h
Quality assurance and Qualified PersonExpanded10 h

ICH Q10 pharmaceutical quality system course outline: 12 modules

12 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Build your quality system on International Council for Harmonisation Q10

    • Why a small company scales Q10 down and still meets it, without adding a layer of paperwork.
    • How the four Q10 elements fit together, so each procedure you write has a place in the system.
    • The line between Good Manufacturing Practice and Q10 that stops you writing the same rule twice.
  2. 2Write a quality policy that drives daily decisions

    • How to write a quality policy a shift lead can quote when the schedule collides with a quality call.
    • What to measure so quality objectives sit beside your production plan instead of against it.
    • The management review agenda that shows an auditor your policy is in use, not on a wall.
  3. 3Structure a Quality Manual that satisfies inspectors

    • How to build a Quality Manual that points each Q10 expectation to the procedure that answers it.
    • The procedures an inspector looks for behind the manual under 21 Code of Federal Regulations Part 211.
    • Why detail in the top-level manual becomes an audit trap, and where it belongs instead.
  4. 4Move product changes through approval without halting production

    • How to route a change request so it is assessed before the next batch is scheduled.
    • The impact assessment steps that show a change leaves product quality where it was.
    • What to do when someone changes a process without approval and a batch is already in progress.
  5. 5Close deviations and corrective actions before they pile up

    • How to record a deviation so the root cause investigation starts from facts, not from memory.
    • The preventive action design that stops the same operator error from returning next quarter.
    • Why inspectors read your open deviations closely, and how to close them before they do.
  6. 6Pull actionable trends from the Annual Product Review

    • How to build an Annual Product Review that answers 21 Code of Federal Regulations 211.180(e).
    • The trend that shows a process drifting toward its limit months before a batch fails.
    • What to put in the review so it triggers an improvement, not a filing.
  7. 7Secure your records to meet data integrity rules

    • How to apply Attributable, Legible, Contemporaneous, Original and Accurate to a batch record.
    • The approval workflow that keeps superseded procedures off the production floor.
    • Why retention periods for archived batch records matter on the day an inspector requests one.
  8. 8Catch compliance gaps through internal audits before inspectors do

    • How to train internal auditors to write findings the department head accepts without argument.
    • The report format that gets management to close self-inspection findings.
    • What to check when you audit your own quality system against Q10, not just your procedures.
  9. 9Qualify suppliers and contract manufacturers you can defend

    • How to write a quality agreement that says who releases, who investigates and who tells whom.
    • The qualification steps that stop a failing raw material before it reaches your line.
    • Why skipping a supplier audit leaves the contract manufacturer's mistake on your desk.
  10. 10Apply risk management principles to catch hazards early

    • How to use a risk assessment to decide which process gets validated first.
    • The mitigation choices that protect the patient while the line keeps running.
    • When to accept a low risk yourself and when to take it to senior management.
  11. 11Cultivate employee habits that prevent quality errors

    • How management behaviour reaches the operator on the line, for better or worse.
    • The training structure that ties each job role to the patient who takes the product.
    • Why a quality culture shortens batch record review by removing errors at the source.
  12. 12Hand inspectors the exact documents they request

    • How to file your documents so the right one reaches the inspector in seconds.
    • The way to answer an inspector's question: briefly, from the record, without guessing.
    • What to prepare before the opening meeting so the first hour sets the tone.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about ICH Q10 pharmaceutical quality system training

What is ICH Q10?

ICH Q10 is the International Council for Harmonisation guideline on the pharmaceutical quality system. It describes how senior management, quality assurance and operations fit together across development, technology transfer, commercial manufacturing and product discontinuation. It is built on ICH Q8 on development and ICH Q9 on risk management, and it asks for measurable quality objectives, defined responsibilities, regular management review and continual improvement rather than a shelf of unread procedures.

What are the four elements of the ICH Q10 quality system?

The four elements are a process performance and product quality monitoring system, a corrective action and preventive action system, a change management system, and management review of process performance and product quality. Each element is expected at every life cycle stage, from development through commercial supply to discontinuation. Knowledge management and quality risk management are the two enablers that feed all four with data and judgement.

Is ICH Q10 mandatory in the EU?

ICH Q10 itself is guidance, published in Part III of the EU GMP guide. What is binding is Chapter 1 of the EU GMP guide, which was rewritten in 2013 around the same pharmaceutical quality system model, and the Directive 2003/94/EC requirements behind it. In practice an inspector will test whether your system does what Chapter 1 requires, and ICH Q10 is the clearest map of how to get there.

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

12 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 2 h in the briefing length and 10 h in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for QA, management. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team