PharmaLectures.com

Courses › Pharma training by country › Same molecule, different rulebook: Indian regulation versus the EU

Same molecule, different rulebook: Indian regulation versus the EU

One dossier base, two rulebooks: your team stops rewriting from scratch.

  • 8 audio modulesthree lengths each
  • 1 h 20 min to 6 h 40 minbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • India companieswho it is written for

Why this training matters

The Qualified Person in Europe opens the file for an imported batch and finds an Indian release pack built for Schedule M. It answers none of the questions Annex 16 raises. The query goes back to your site, and the batch waits while the launch date moves.

What changes after this course

Your team drafts from one Common Technical Document base and writes the regional Module 1 for each authority. Variations, safety reports and batch files follow the right rulebook the first time. You hold a certificate per learner and a training record per person to show any auditor.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

What this course gives your people

Your regulatory affairs team stops starting from a blank page for each region. They build Common Technical Document Modules 2 to 5 once, then write the regional Module 1 for the European Medicines Agency and the Central Drugs Standard Control Organisation separately. The Marketing Authorisation Application leaves with its administrative data in place, and the reviewing authority has fewer reasons to stop at validation.

Quality assurance leads sit down with Schedule M in one hand and European Good Manufacturing Practice Part I in the other, and settle each difference before the audit date. Batch records, qualification files under Annex 15 and the site master file get fixed in advance. When an inspector from either side asks for a document, it is already in the folder.

A single serious case no longer means two rounds of data entry. Pharmacovigilance specialists set up Pharmacovigilance Programme of India and EudraVigilance reports from the same source record, and they know when each reporting clock starts. Clinical operations teams check protocols and consent forms against the New Drugs and Clinical Trials Rules and Regulation (EU) No 536/2014 before a site is opened.

Variations and batch release stop being last-minute scrambles. Regulatory and supply chain staff sort changes into Type IA, Type IB and Type II under Regulation (EC) No 1234/2008 and know when a Type IA change is notified. The Qualified Person receives a batch file built to the questions Annex 16 raises, so certification of an imported batch does not wait on emails to India.

Who needs this training

  • Regulatory Affairs Manager

    The day a validation query arrives because Module 1 was written for India, not Europe, and the filing date slips. The regional part gets built right the first time.

  • Quality Assurance Head

    Sits across from a European inspector who questions a batch record that passed every Indian audit. The Schedule M and Part I comparison is already done and filed.

  • Pharmacovigilance Specialist

    Holds one serious case that must reach both the Pharmacovigilance Programme of India and EudraVigilance, and needs one clean source record instead of retyping the same data twice.

  • Clinical Operations Lead

    Prepares a protocol and consent form for an Indian site that a European sponsor also wants to use, and must know which rules apply where.

  • Export Supply Chain Manager

    Waits on a European Qualified Person who has sent a query back on an export batch file, while the shipment and the launch date wait too.

Roles: Regulatory affairs, Quality assurance and Qualified Person

Businesses: every kind of pharma company

Countries: India

Selling into: Europe and the UK

Courses are in English. Other languages on request.

After this course your people can

  1. Draft a Module 1 for a European Marketing Authorisation Application and list what the Indian file does not supply.
  2. Compare a Schedule M batch record with European Good Manufacturing Practice Part I and mark each gap that needs a fix.
  3. Set up one adverse event record that produces reports for the Pharmacovigilance Programme of India and for EudraVigilance.
  4. Check a protocol and consent form against the New Drugs and Clinical Trials Rules before a site is opened.
  5. Classify a manufacturing change as Type IA, Type IB or Type II under Regulation (EC) No 1234/2008.
  6. Assemble the batch file a Qualified Person needs under Annex 16 to certify an imported batch.
  7. Answer a European inspector's question on your Quality Management System by pointing to the controlled document.

What the company gets

  • Dossiers reach European authorities with the regional Module 1 already written, so fewer filings come back for administrative gaps.
  • Your site is ready for an inspection by the Indian regulator or a European authority, with the Schedule M and Part I differences already closed.
  • Safety reports for India and Europe come from one source record, so a serious case does not depend on one person retyping data.
  • Imported batches reach the Qualified Person with a file that answers the Annex 16 questions, which cuts the back and forth with your site.
  • Each learner finishes a recorded multiple-choice questionnaire per module, and you keep a certificate and a training record for every person to show an auditor.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 8 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing1 h 20 min10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard3 h 20 min25 min a module, for regulatory, quality and business-development staff
Expanded6 h 40 min50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Regulatory affairsStandard3 h 20 min
Quality assurance and Qualified PersonStandard3 h 20 min

Course outline: 8 modules

8 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Know who decides what in India and at the European Medicines Agency

    • Why an Indian approval carries no weight in Europe, and how to plan for that from day one.
    • How to know when a national competent authority decides and when the European Commission does.
    • What to do when your launch plan assumes both agencies will review the same dossier at the same pace.
  2. 2Build one Marketing Authorisation Application that passes in India and Europe

    • How to build Common Technical Document Modules 2 to 5 once and reuse them for both filings.
    • The Module 1 pieces Europe expects, from product information to application forms, in one checklist.
    • When your Indian dossier is ready to submit in Europe, and when a gap means holding it back.
  3. 3Align Schedule M and European Good Manufacturing Practice Part I on site

    • How to lay Schedule M beside European Good Manufacturing Practice Part I and mark each gap.
    • Which qualification and validation records Annex 15 expects to see on file before an inspector arrives.
    • What to do when a Schedule M batch record format leaves out a detail a European inspector expects.
  4. 4Set up adverse event reporting for India and EudraVigilance

    • How to enter one adverse event once and produce the right report for India and for EudraVigilance.
    • Why one serious case can start two reporting clocks, and how to keep both on time.
    • What your safety database must hold so one case fits both Indian and European reports.
  5. 5Adapt clinical protocols to the New Drugs and Clinical Trials Rules

    • How to rewrite a protocol section so it meets the New Drugs and Clinical Trials Rules.
    • What the ethics committee and the Indian regulator each need to see before a trial starts.
    • How to check one consent process against Indian and European trial rules before the site visit.
  6. 6File Type IA variations and report quality defects in both regions

    • How to tell a Type IA variation from a Type IB or Type II change under Regulation (EC) No 1234/2008.
    • When a Type IA change can go ahead first and when it must be notified straight away.
    • What to do on the day a quality defect is found, so both authorities hear it from you first.
  7. 7Prepare batch documentation the Qualified Person can sign for release

    • The batch file layout that lets a Qualified Person certify without sending a query back to India.
    • Why Annex 16 makes the Qualified Person ask about your site's compliance, and the papers that answer it.
    • What to do when test results from India and the European import testing do not match.
  8. 8Answer audit questions on your Quality Management System from both agencies

    • How to answer a Quality Management System question with the right document already in hand.
    • The questions a European inspector puts to a site that only prepared for Indian audits.
    • Why the site master file deserves its own review before two agencies visit.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about this course

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

8 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 1 h 20 min in the briefing length and 6 h 40 min in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for India companies. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

What does it cost per learner?

The list price is 9 euros per module, per learner, per year, so this course is 72 euros for one person for twelve months. The price per learner falls as more people take the same course: 10 learners pay 10 percent less and the discount keeps growing to 50 percent at 1000 learners. Type a number on the price panel and the yearly total appears.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team