PharmaLectures.com

Courses › GMP, GDP, quality and compliance › Continuous manufacturing and ICH Q13: for companies actually planning the step

Continuous manufacturing and ICH Q13: for companies actually planning the step

Defend your continuous manufacturing plan before the inspector asks the hard question.

  • 8 audio modulesthree lengths each
  • 1 h 20 min to 6 h 40 minbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • Engineering, managementwho it is written for

Why this training matters

A Food and Drug Administration inspector asks how your continuous line copes when incoming material changes. Three engineers give three answers. A Form 483 follows, approval slips, and your team spends the next weeks writing responses instead of building the line.

What changes after this course

Your engineers answer with the exact section of International Council for Harmonisation (ICH) Q13 behind them. Each learner finishes with a certificate, and you hold the training record that shows who was prepared. Your submission keeps its date.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

What this course gives your people

Your process engineers stop arguing over what ICH Q13 means for the line they are drawing. They set parameters as flow rates from the first sketch, and they write standard operating procedures that already say what happens when incoming material shifts. The redesign that usually arrives after equipment is ordered does not arrive.

Quality assurance reads a draft control strategy and finds the answer on real-time anomaly detection already on the page. Approval stops bouncing back to engineering. The same document ties to ICH Q8, Q9 and Q10, so the reviewer sees one quality system and not four separate stories.

In a pre-submission meeting with the Food and Drug Administration or the European Medicines Agency, your regulatory affairs lead answers the batch definition question on the spot. The stability plan, the validation data and the dossier structure all say the same thing, so nobody has to improvise.

Your manufacturing manager runs long campaigns without waiting for the upset. When material flow drifts, operators follow a written recovery, divert what is out of limits and keep what is acceptable. The laboratory knows when to pull stability samples, and the move from batch stays on its date.

Who needs this training

  • Process Engineer

    Your design review is close and the batch parameters will not fit a flow model. After this course you restate them as flow rates and residence times, and the review moves on.

  • Quality Assurance Specialist

    A draft control strategy lands on your desk with no word on incoming material variability. You know what ICH Q13 expects, so you mark the exact gap instead of rejecting the whole document.

  • Regulatory Affairs Lead

    The Food and Drug Administration asks in a pre-submission meeting how you define a batch for stability. You answer from ICH Q13 and your own stability plan, without a pause or a promise to follow up.

  • Manufacturing Operations Manager

    A process upset hits a continuous run at night. Your operators open a written recovery procedure, divert the out-of-limit material and save the acceptable product, and you read about it in the morning report.

Roles: Owner, CEO and board, Production and engineering

Businesses: every kind of pharma company

Countries: India, China, Türkiye, Korea, Japan, Taiwan, Egypt, Gulf and MENA, Brazil and Latin America, Pakistan, Bangladesh and Vietnam, United States, Europe

Selling into: any jurisdiction

Courses are in English. Other languages on request.

After this course your people can

  1. Point to the ICH Q13 passage that supports each choice in your development and control strategy.
  2. Draft a transition plan that lists the equipment upgrades and the training your facility needs, with an owner for each.
  3. Write a control strategy that states how incoming material variability is detected and handled in real time.
  4. Define a batch for a continuous run and set the stability testing that goes with that definition.
  5. Link critical process parameters to critical quality attributes using the Quality by Design approach of ICH Q8.
  6. Arrange a submission dossier so a reviewer can find the continuous process section and the validation data quickly.
  7. Recover from a material flow deviation by diverting out-of-limit material and keeping acceptable product.

What the company gets

  • Your engineers draw continuous lines with the control strategy answer already built in, so the design does not come back for rework.
  • Your regulatory affairs team walks into pre-submission meetings with one agreed answer on batch definition and stability.
  • Your inspector gets a straight answer on material variability, backed by a named ICH Q13 reference, instead of three different ones.
  • You hold a certificate for each learner and a training record per person, ready to show on the day someone asks.
  • Material flow deviations meet a written recovery, so a single upset stops costing you the whole run.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 8 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing1 h 20 min10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard3 h 20 min25 min a module, for regulatory, quality and business-development staff
Expanded6 h 40 min50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Owner, CEO and boardBriefing1 h 20 min
Production and engineeringExpanded6 h 40 min

Course outline: 8 modules

8 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Move your batch process to continuous manufacturing in planned stages

    • How to restate your batch parameters as flow rates and residence times before design review starts.
    • Why the point where separate steps become one integrated line is where old batch habits stop working.
    • When continuous is worth the move for a product and when staying with batch is the better call.
  2. 2Apply ICH Q13 to your development and control strategy

    • How to point to the exact ICH Q13 passage when an assessor asks why you chose your control approach.
    • The way ICH Q13 sits beside ICH Q8, Q9 and Q10, so your quality system tells one story, not four.
    • What ICH Q13 says about batch definition, so you settle it in development and describe it in the submission.
  3. 3Plan the equipment upgrades and training your transition needs

    • How to audit your current equipment line by line before you commit to a purchase order.
    • The skills you must hire or train for before start-up, so operators are not learning on product.
    • Why a training plan written beside the equipment list keeps your start-up date from moving.
  4. 4Design a process with the Quality by Design approach of ICH Q8

    • How to link each critical process parameter to the critical quality attribute it moves, using ICH Q8.
    • The design space statement that lets your team run inside proven limits on a continuous line.
    • What to do when Process Analytical Technology readings and your design space disagree on a running line.
  5. 5Write a control strategy that absorbs material variability in real time

    • Why your control strategy names incoming material variability before the first run, not after a deviation.
    • How to write the response to an anomaly so operators divert the bad material and keep the good.
    • The ICH Q13 ideas on state of control that give your quality unit something firm to approve.
  6. 6Set shelf-life and stability testing for continuous runs

    • How to set a batch size for stability when the line never stops, and defend that choice.
    • How the stability expectations you already know apply to product made on continuous equipment.
    • What to tell the laboratory about when to pull samples, so pulls match your batch definition.
  7. 7Prepare submission documents an agency reviewer can follow fast

    • How to arrange your dossier so a European Medicines Agency reviewer finds the continuous section first.
    • The continuous-process questions reviewers raise in pre-submission meetings, answered before they ask.
    • What goes into the validation file that defends your continuous process when a reviewer pushes back.
  8. 8Fix material flow deviations before they stall your line

    • How extended run time as a route to scale-up changes the validation story you tell under ICH Q13.
    • How to add a new data management system without breaking the compliance you already hold.
    • The change steps that bring operators with you, so they trust the line from the first shift.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about this course

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

8 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 1 h 20 min in the briefing length and 6 h 40 min in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for Engineering, management. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

What does it cost per learner?

The list price is 9 euros per module, per learner, per year, so this course is 72 euros for one person for twelve months. The price per learner falls as more people take the same course: 10 learners pay 10 percent less and the discount keeps growing to 50 percent at 1000 learners. Type a number on the price panel and the yearly total appears.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team