PharmaLectures.com

Courses › GMP, GDP, quality and compliance › Change control and ICH Q9 risk management: doing it daily, not just for the audit

Change control and ICH Q9 risk management: doing it daily, not just for the audit

Your team closes change records that an inspector can read once and accept.

ICH Q9 is the international guideline on quality risk management for medicines. It was adopted in 2005 and revised as ICH Q9(R1) in January 2023. It gives a shared process for identifying, scoring, controlling and reviewing risks to product quality, and a toolbox for doing so. In the European Union it sits in Part III of the EU GMP guide and is cited in Chapter 1, so inspectors expect to see its logic behind every change control, deviation and validation decision.

  • 8 audio modulesthree lengths each
  • 1 h 20 min to 6 h 40 minbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • QA, productionwho it is written for

Why ICH Q9 quality risk management training matters

An inspector opens a closed change control file and finds no risk assessment behind it. The next question is which batches ran after the change. Release stops while your team rebuilds a decision from months ago, and the finding lands in the report.

What changes after this course

Your QA and production staff classify the change, pick the risk tool and name the owners before anyone touches the equipment. The file you hand over answers the inspector's questions itself. You hold a certificate per learner and a training record for each person.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

ICH Q9 quality risk management training: what this course gives your people

A request from production reaches your desk and you know at the first read whether it needs a change control form. You apply the two principles of International Council for Harmonisation Q9, sort the change by its effect on product quality, and write a classification the quality unit accepts. The form stops coming back for a missing impact assessment.

Choosing the tool stops being a debate. For an equipment upgrade you use Failure Mode and Effects Analysis. For a process change that suits it you reach for Hazard Analysis and Critical Control Points. For a small one you justify a checklist in a line. The reasoning sits in the file, linked to the final classification.

On go-live day the roles in the change plan are named and the operators' training records are checked first. The change management expectations in EU GMP Chapter 1 and Annex 15 are met before the line restarts. When a deviation follows, your Corrective and Preventive Action goes to the root cause, so the same one does not return.

When the inspector asks for a closed change, you hand over one file. The success criteria, the effectiveness check and the sign-off agree with each other, and you explain the risk reasoning in plain sentences. Title 21 of the Code of Federal Regulations, Part 211 has the quality control unit review and approve changes to written procedures. Your file shows it was done.

Who needs ICH Q9 quality risk management training

  • Quality Assurance Specialist

    A change request lands from production and you must decide whether it needs a full Failure Mode and Effects Analysis or a simple checklist. You decide in minutes and write the reason into the form.

  • Production Supervisor

    An equipment upgrade went in over the weekend, your operators were not told, and the training records are not updated. You learn to check roles and training before the line restarts.

  • Quality Assurance Manager

    An inspector asks for the effectiveness check on a closed change. You open the file and the proof is there, because the success criteria were written into the form at the start.

  • Validation Engineer

    You write the post-implementation review and the original form already says what success looks like. You stop spending days reconstructing criteria that nobody defined.

Roles: Quality assurance and Qualified Person, Production and engineering

Businesses: every kind of pharma company

Countries: India, China, Türkiye, Korea, Japan, Taiwan, Egypt, Gulf and MENA, Brazil and Latin America, Pakistan, Bangladesh and Vietnam, United States, Europe

Selling into: any jurisdiction

Courses are in English. Other languages on request.

After this course your people can

  1. Sort a daily change request into the right class on the form and state the reason in one line.
  2. Apply the two principles of International Council for Harmonisation Q9 to decide how much formality a change deserves.
  3. Choose between Failure Mode and Effects Analysis, Hazard Analysis and Critical Control Points, and a checklist, and justify the choice in the file.
  4. Name an owner and check operator training for every step before an equipment change goes live.
  5. Write success criteria that a later effectiveness check can measure.
  6. Link a deviation to the change that caused it and write a Corrective and Preventive Action aimed at the root cause.
  7. Walk an auditor through a closed change file from request to sign-off without searching for pages.

What the company gets

  • Closed change files hold the risk assessment, the training check and the effectiveness proof, so the inspector's first question has an answer on the page.
  • Your quality unit spends less time sending impact assessments back for rewriting.
  • Equipment upgrades reach the line with trained operators and named owners, so fewer weekends end in a stopped line on Monday.
  • Every learner has a certificate and a training record, so you can show who was trained on change control and when.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 8 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing1 h 20 min10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard3 h 20 min25 min a module, for regulatory, quality and business-development staff
Expanded6 h 40 min50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Quality assurance and Qualified PersonExpanded6 h 40 min
Production and engineeringExpanded6 h 40 min

ICH Q9 quality risk management course outline: 8 modules

8 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Apply International Council for Harmonisation Q9 to your daily changes

    • The two Q9 principles that tell you how much paperwork a change deserves.
    • How to turn a hallway request into a risk question before anyone touches the line.
    • Why a change with no recorded risk reasoning draws the inspector's next question.
  2. 2Classify each change correctly and speed up your impact assessment

    • When a small tweak needs a change control form and when it does not.
    • How to sort a change by its effect on product quality at the first read.
    • The classification mistake that sends your impact assessment back for a second round.
  3. 3Choose the right risk assessment tool for the change in front of you

    • How to pick Failure Mode and Effects Analysis when an equipment upgrade has many ways to fail.
    • What to do when a process change calls for Hazard Analysis and Critical Control Points instead.
    • Why a simple checklist is the right tool for a low-risk change, and how to say so in the file.
  4. 4Document a change so it satisfies strict regulatory requirements

    • How to fill in the change control form so quality approves it at the first read.
    • The audit trail entries that let you defend a decision long after the people involved have moved on.
    • Why a missing signature or date becomes a data integrity question, and how to prevent it.
  5. 5Run the implementation with clear roles and responsibilities

    • How to name an owner for every step so no department waits on another.
    • The training check that keeps an untrained operator off the line on go-live day.
    • What to do when a role in the change plan is vague, before it stalls the work.
  6. 6Verify effectiveness and close change control records on time

    • How to write success criteria in the change form that you can measure later.
    • The effectiveness check that shows whether the change solved the problem or only moved it.
    • Why a change left open past its due date becomes a finding, and how to close it on time.
  7. 7Handle deviations and Corrective and Preventive Actions tied to changes

    • How to trace a deviation back to the equipment change that caused it.
    • The Corrective and Preventive Action that targets the root cause, not the symptom.
    • Why a repeat deviation after a change makes the inspector widen the questions.
  8. 8Present your change control records to an auditor without hesitation

    • How to arrange a change file so the inspector finds the right page in seconds.
    • The plain sentences that explain your risk process to a skeptical auditor.
    • How to make the impact assessment and the final sign-off tell the same story.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about ICH Q9 quality risk management training

What is ICH Q9?

ICH Q9 is the quality risk management guideline of the International Council for Harmonisation. It describes a repeatable process: start the assessment, identify and analyse the hazards, evaluate the risk, decide how to reduce or accept it, communicate the result and review it later. It applies to the whole product life cycle, from development through manufacturing to discontinuation, and underpins decisions on change control, deviations, validation and supplier qualification.

What changed in ICH Q9(R1)?

The 2023 revision kept the original process and added four themes. It asks companies to manage subjectivity in risk scoring, to choose the level of formality in proportion to the risk, to use risk-based decision making deliberately, and to treat product availability as a quality risk, for example when a shortage would harm patients. The tools annex stayed, and the text now says the level of formality should match the level of risk.

Which tools does ICH Q9 name for risk assessment?

Annex I of ICH Q9 lists failure mode effects analysis, failure mode effects and criticality analysis, fault tree analysis, hazard analysis and critical control points, hazard operability analysis, preliminary hazard analysis, and risk ranking and filtering. It also allows supporting statistical tools and simple methods such as flowcharts, check sheets, process maps and cause and effect diagrams. The guideline does not require any one tool; the course teaches when each one earns its keep.

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

8 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 1 h 20 min in the briefing length and 6 h 40 min in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for QA, production. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team