PharmaLectures.com

Courses › Regulatory affairs by region › Asia Pacific: Japan PMDA and foreign-manufacturer accreditation, the paperwork behind it

Asia Pacific: Japan PMDA and foreign-manufacturer accreditation, the paperwork behind it

Your overseas sites get Japanese accreditation without a returned application.

  • 10 audio modulesthree lengths each
  • 1 h 40 min to 8 h 20 minbriefing to expanded
  • Workbook, transcript, certificateand a recorded quiz per module
  • RA, QA, BDwho it is written for

Why this training matters

A foreign manufacturer accreditation application goes to the Pharmaceuticals and Medical Devices Agency (PMDA) with one section of the Site Master File missing. Your Japanese partner waits. The launch date moves while your team rewrites the dossier.

What changes after this course

Your team files complete applications, answers inspectors at the line and writes corrective action plans a reviewer can accept. You hold a certificate per learner and a training record per person, ready for any compliance review.

Watch the pitch

3:43 on how an audio course is bought, listened to and recorded. Full screen, one click.

Watch the pitch3:43, full screen, one click

What this course gives your people

Your regulatory team looks at the supply chain and says which sites need foreign manufacturer accreditation under Article 13-3 of the Pharmaceutical and Medical Device Act, without waiting for a consultant. The application form gets filled field by field, and the Site Master File that goes with it answers the reviewer's questions before they are asked.

Before the inspector arrives, quality managers hold your procedures up against the Japanese Good Manufacturing Practice Ministerial Ordinance and close the gaps. Mock audits rehearse the kinds of questions an inspector may put to staff on the production floor. Operators answer what is asked, and batch records go across the table without extras that open a new line of inquiry.

After the visit, your specialists rank each observation and write Corrective and Preventive Action plans a reviewer can accept. Renewal dates and change notifications sit inside your Quality Management System, so a line modification is reported when it happens and the certificate never lapses quietly.

Business development stops promising dates it cannot keep. Before a Japanese partner is told a launch window, the team checks which contract manufacturers need accreditation and raises it in the first meeting, while the schedule can still change.

Who needs this training

  • Regulatory Affairs Manager

    Your application comes back because the Site Master File lacks a required section. After this course you build the file against the reviewer's checklist, so the launch date stays where you promised it.

  • Quality Assurance Director

    An inspector from Tokyo asks a line operator about a testing step. Your people have already rehearsed that exact moment, so a routine visit stays routine and no new finding appears.

  • Business Development Lead

    You are planning a Japanese partnership and need a delivery date. You can now see which contract manufacturers need accreditation and put that into the schedule before you commit.

  • Site Quality Head

    The agency issues its observations and your reply is due. You rank each finding, set the deadline in writing and draft a Corrective and Preventive Action plan a reviewer can close.

Roles: Business development and export sales, Regulatory affairs, Quality assurance and Qualified Person

Businesses: every kind of pharma company

Countries: India, China, Türkiye, Korea, Japan, Taiwan, Egypt, Gulf and MENA, Brazil and Latin America, Pakistan, Bangladesh and Vietnam, United States, Europe

Selling into: Asia Pacific

Courses are in English. Other languages on request.

After this course your people can

  1. List the foreign manufacturing sites and contract manufacturers that need Japanese accreditation, with the reason for each one.
  2. Complete the foreign manufacturer accreditation application form without leaving a single field blank.
  3. Update your Site Master File so it answers the questions a Japanese reviewer is likely to ask.
  4. Escort an inspection team through your plant and hand over only the records they have requested.
  5. Write a Corrective and Preventive Action plan that a reviewer can accept as closing the finding.
  6. Decide which facility changes must be notified to Japan before they reach your next inspection.
  7. Set the start date for re-accreditation work so your current certificate never reaches its end date.

What the company gets

  • A Japanese launch no longer waits on an accreditation application that was returned for a missing Site Master File section.
  • Your quality team has a straight answer ready when a Japanese inspector asks about a procedure, a record or a change.
  • Business development gives Japanese partners a schedule that already counts the contract manufacturers needing accreditation.
  • Renewal dates and change notifications live in your own Quality Management System, so the certificate does not lapse unnoticed.
  • You hold a training record and a certificate per learner to show a reviewer who was trained and when.

The evidence: questionnaire, training record, certificate

EU GMP Chapter 2, section 2.11, and 21 CFR 211.25 both ask for training that is documented and shown to work. This is what each learner leaves behind.

A recorded questionnaire per module

Every one of the 10 modules ends with a multiple-choice questionnaire. The result is recorded per person with a timestamp, whichever of the three lengths the person listened to.

A per-person training record

The export lists each learner, each module, the result and the date, which is the training record EU GMP Chapter 2 and 21 CFR 211.25 ask you to keep and the first thing an inspector asks for.

A certificate per learner

Name, company, course, hours, the guideline version taught and the date. It documents in-company training; it is not a professional qualification or an accreditation.

Your pass mark, your rule

There is no fixed pass mark. Your quality or human-resources manager decides what counts as passed and when a module is retaken, exactly as your training procedure says.

Delivered within 72 hours of payment, with the workbook, the full transcript and a source for every fact in the audio.

How long it takes, by who is listening

Nobody spends a day in a classroom. Every module exists in three lengths; a person takes the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Briefing1 h 40 min10 min a module, for executives, sales and anyone who must know the rules, not run them
Standard4 h 10 min25 min a module, for regulatory, quality and business-development staff
Expanded8 h 20 min50 min a module, for technical staff who run the procedure day to day
Who takes this courseLengthTotal time
Business development and export salesBriefing1 h 40 min
Regulatory affairsStandard4 h 10 min
Quality assurance and Qualified PersonStandard4 h 10 min

Course outline: 10 modules

10 modules. Under each title are the three things the listener can do afterwards; the audio itself runs 10 to 50 minutes depending on the length chosen.

  1. 1Anticipate how far PMDA authority reaches into your foreign plants

    • Why your plant abroad answers to Tokyo under the Pharmaceutical and Medical Device Act.
    • The early signs that a document request from Tokyo is coming, so your file is ready first.
    • What to tell your Japanese partner when they ask whether your sites are in scope.
  2. 2Pinpoint which overseas facilities need Japanese accreditation

    • How to match each product category on your list to a clear yes or no on site accreditation.
    • Why some suppliers stay outside foreign manufacturer accreditation, and how you prove it on paper.
    • What to do when three contract manufacturers share one product, and how each site is documented.
  3. 3Compile the documents your accreditation application requires

    • The Site Master File sections a reviewer looks for first, so the file is complete before it leaves.
    • How to fill every field of the accreditation application so nothing comes back blank.
    • What to do when your quality certificates do not match the formats Japan expects.
  4. 4Align your site with Japanese Good Manufacturing Practice standards

    • Where Japanese Good Manufacturing Practice asks something your current procedures do not answer.
    • The quality control records Japanese inspectors tend to ask for first, and how to find them fast.
    • How to map each of your procedures to a Japanese requirement in one gap list.
  5. 5Ready your facility and staff for a PMDA on-site inspection

    • Why some sites get a physical inspection and others a document review, and how to read your own risk.
    • How to run a mock audit that feels like a Japanese visit, not a friendly internal check.
    • What a line operator says when the inspector asks about the job, and where the answer stops.
  6. 6Host PMDA officials and run the daily inspection agenda

    • The inspection day from opening meeting to closing meeting, so nothing on the agenda surprises you.
    • How to hand over batch records that answer the question asked and nothing that starts a new one.
    • Why a rushed translation of a procedure can derail the lead inspector, and how to prevent it.
  7. 7Draft Corrective and Preventive Action plans reviewers accept

    • How to rank each observation by seriousness before you write a word of your reply.
    • When your response deadline starts and how to confirm it in writing with the agency.
    • What a Corrective and Preventive Action plan needs on the page for a reviewer to close the finding.
  8. 8Report facility changes and keep your PMDA accreditation

    • Which changes to buildings, equipment and lines need a notification, and which stay in your own records.
    • How to report a new building or an expansion and what it means for your next inspection.
    • What happens at the next inspection if a line change was never reported, and how to fix it first.
  9. 9Trigger re-accreditation before your certificate expires

    • When to start renewal work so the certificate on your wall never reaches its end date.
    • Which Site Master File updates to make before re-accreditation, so the file matches the plant.
    • How to close past findings before renewal begins, so the file shows what was done and when.
  10. 10Build PMDA compliance into your Quality Management System

    • How to place Japanese reporting deadlines inside the change control procedure you already run.
    • The self-inspection checklist items that catch a Japan problem before the agency does.
    • Why one Quality Management System with a Japan layer spares your team a second set of procedures.
The founders

One of us was inspected. The other one pays for the training.

Every claim below is sourced on the about page: the medicines register, the Lithuanian Pharmaceutical Union board list, the university directory.

Justina Krukonytė-Racz

Justina Krukonytė-Racz

Co-founder. Licensed pharmacist.

GDPResponsible PersonWarehouse & logistics

Licensed pharmacist. Responsible Person at Tamro (PHOENIX group), where she led the GDP set-up of the distribution centre.

The Responsible Person is the named person the regulator holds accountable for every pallet that leaves the building.

She writes the modules around the procedures a GDP inspection checks. Board member of Lithuanian Pharmaceutical Union.

Listed in the Lithuanian medicines register as Pharmacist.

Prof. Ben Racz

Prof. Ben Racz

Co-founder. Builds the platform and is responsible for delivery, records and pricing.

Platform & deliveryQuantitative researchCarnegie Mellon

He was Professor of the Practice at the College of Engineering at Carnegie Mellon University, where he taught Advanced Quantitative Finance and Algorithmic Trading to MSc students.

He is the founder and Managing Director of Algorithmic Sciences, a scientific research and consulting firm. Earlier he co-founded a data-driven growth consultancy, a data-science based wholesale trading company and an information security firm.

More about Ben at benracz.com

Questions about this course

Is there a certificate?

Yes. Every learner who finishes the course receives a certificate in their own name, and every module ends with a recorded multiple-choice questionnaire, so the certificate sits on top of a per-person training record. The certificate documents in-company training; it is not a professional qualification or an accreditation, and your quality or human-resources manager sets the pass mark and decides when a module is retaken.

How long does the course take?

10 modules, each in three lengths: a 10-minute briefing, a 25-minute standard run and a 50-minute expanded walk-through. The whole course takes 1 h 40 min in the briefing length and 8 h 20 min in the expanded length. People take the length their role needs, and every length ends with the same recorded questionnaire, so the training record is complete either way.

Who should take this course?

It is written for RA, QA, BD. Owners, managers and sales staff hear the briefing length, regulatory, quality and business-development staff take the standard run, and the people who run the procedure every day get the expanded version. One licence covers one named person on this course for a year, so the same title can be rolled out across a whole team at once.

Is this training accepted as a GMP training record by an auditor?

EU GMP Chapter 2 and 21 CFR 211.25 require documented, effective training, and that is what the course produces: a recorded multiple-choice result per module and per person, a certificate per learner and a transcript of what was taught. No provider can promise acceptance by a specific inspector; the record is built to answer what inspectors ask for, and your quality manager decides the pass mark.

How is it delivered and how fast?

The course arrives as audio files with a companion workbook, a full transcript and the questionnaire per module, within 72 hours of your payment arriving. You host the files on your own system or share them as you like; there is no platform to log into and no learner management system to set up. The free sample module arrives on request, before any purchase.

What does it cost per learner?

The list price is 9 euros per module, per learner, per year, so this course is 90 euros for one person for twelve months. The price per learner falls as more people take the same course: 10 learners pay 10 percent less and the discount keeps growing to 50 percent at 1000 learners. Type a number on the price panel and the yearly total appears.

Get this course for your team

One licence is one person on this course for a year. All three lengths, the workbook, the certificate and the training record are included in every purchase. Pick how many people, add it to the cart, and you have an invoice in your inbox.

Free sample module

Hear one full module before you spend a cent. Send your company and the role you want trained, and a complete sample module comes back with its workbook and transcript.

Connect on WhatsApp

or email [email protected], or ask for a written quote for your team